|
Post by mullet on Jul 11, 2022 16:31:53 GMT -7
Sorry if this is the proper place to post this and I tried to find the answer before posting. What is the approximate turn around time to upgrade my 2014 maz 38 senior with reverb head including the 1/2 power switch. Thank you.
|
|
|
Post by purpletele on Jul 11, 2022 18:55:43 GMT -7
Sorry if this is the proper place to post this and I tried to find the answer before posting. What is the approximate turn around time to upgrade my 2014 maz 38 senior with reverb head including the 1/2 power switch. Thank you. Based upon what I have seen, probably 4-5 weeks door to door. Z, please correct me if I'm wrong.
|
|